WUN Bioenergie, Pellet plant Wunsiedel, Germany
© eta Energieberatung
Facts & Figures
Genset / gas engine: | 3 x TCG 2032B V16 |
Segment / gas type: | Natural gas |
Customer: | WUN Pellets GmbH, Germany |
Total output: | 13.500 kWel and 15.600 kWth |
Commissioning (Test operation): | November 2018 |
On March 15, 2019, the new pellet plant of WUN Pellets GmbH went live in Wunsiedel, Upper Franconia. The 30-million-euro investment was officially inaugurated by Dr. Markus Söder, Bavaria’s Minister-President. The pellet plant’s control energy power plant, which runs with three MWM TCG 2032B V16 gas engines, is considered to be an outstanding example of eco-friendly, distributed energy generation. In recognition of its high energy efficiency and flexibility, “Energie & Management” designated the cogeneration power plant as “Cogeneration Power Plant of the Month” of March 2019.
Click this brochure to access the digital publishing platform issuu.com. This website is governed by the issuu Privacy Policy