Facts & Figures
Genset / gas engine: | 2 x TCG 2020 V12 |
Segment / gas type: | natural gas |
Customer: | Ronald Bunnik Bromelia’s – Pijnacker, Netherlands |
Total output: | 2.400 kWel |
Commissioning: | 2009 |
Since the beginning of 2009, the business has been using a CHP installed by MWM. Together with Ronald-Jan Post from DLV, Ronald Bunnik Bromelia’s decided to install a 2.4 megawatt power plant solution, divided in two 1.2-megawatt engines.
Delivery to the mains network (grid?) has only been possible in Pijnacker since 1 January 2009. That is also the reason why a CHP was not purchased earlier.