Povolzhye Trade Center, Saratov, Russia
Facts & Figures
Genset/engine: | 5 x TCG 2020 V20 |
Segment/gas type: | Trigeneration / Natural gas |
Customer: | Povolzhye Trade Center |
Contractor: | NEUHAUS |
Total output: | 10 MWel / 10 MWth |
Commissioning: | 2016 |
The 10 MW trigeneration power plant in Saratov was put into operation in 2016 by NeuHaus, the official MWM distributor in Russia. The power plant provides electricity and heat to the shopping and entertainment center. In addition to 10 MW of electricity, 4 MW of cold is used for the air conditioning system in summer. The operating mode is island /parallel with the grid with automatic switch to island and reverse synchronization.