Logistics Centre, Perm, Russia
Facts & Figures
Genset/engine: | 1 х TCG 2020 V12 |
Segment/gas type: | Natural gas |
Customer: | Tander JSC |
Contractor: | Valdex Energetiсa LLC |
Total output: | 1.2 MWel / 1.2 MWth |
Commissioning: | 2018 |
The power plant for Logistics Centre of Tander JSC is designed to provide electric and thermal power to the storage facility. The main generating equipment is a MWM gas genset TCG 2020 V12 in a container module with an electric capacity of 1.2 MW, voltage of 10.5 kW, with a recovery system and thermal capacity of 1.22 MW. The plant is connected to to the existing power supply system via a kV block-modular switchgear. This device distributes electricity generated by the power plant and received from the Zhukovskaya substation to the off-site power supply grids.