Logistic Centre, Yaroslavl, Russia
Facts & Figures
Genset/engine: | 1 х TCG 2020 V12 |
Segment/gas type: | Natural gas |
Customer: | Tander JSC |
Contractor: | Valdex Energetiсa LLC |
Total output: | 1.2 MWel / 1.2 MWth |
Commissioning: | 2018 |
The power plant for Logistic Centre of Tander JSC is designed to provide electric and thermal power to consumers of the logistic center. The main generating equipment is a MWM gas genset TCG 2020 V12 in a container module with an electric capacity of 1.2 MW, voltage of 10.5 kW, with a recovery system and thermal capacity of 1.22 MW. The plant is operated all year round round-the-clock, in island and combined modes in parallel with an external grid without cross flows.