Lenta Trade Center, Nizhny Tagil, Russia
Facts & Figures
Genset/engine: | 2 x TCG 2016 V16 |
Segment/gas type: | Natural gas |
Customer: | Lenta Trade Center |
Contractor: | NEUHAUS |
Total output: | 1.6 MWel / 1.6 MWth |
Commissioning: | 2018 |
The 1.6 MW CHP plant in Nizhny Tagil was put into operation in 2018 by NEUHAUS, the official MWM distributor in Russia. The power plant based on original MWM containers with heat recovery system is designed to provide electricity and heat to the shopping and entertainment center. It is operated in parallel with the grid.