Industrial Park-1, Krasnodar Territory, Russia
Facts & Figures
Genset/engine: | 4 x TCG 2020K V16 2 х TCG 2032 V16 |
Segment/gas type: | Natural gas |
Customer: | AO Tander |
Contractor: | Electrosystems Co. Ltd. |
Total output: | 15.6 MWel / 24.6 MWth |
Commissioning: | 2017 |
In the autumn of 2017 MWM Distributor “Electrosystems” finished the construction works of the power plant Industrial Park in the Krasnodar area which provides electrical and thermal power to the food processing industrial facilities located on the territory of the Industrial Park. The plant consist of two 4.3 MW TCG 2032 V16 and four 1.5 MW TCG 2020K gensets. Its installed electric capacity amounts to 15.6 MW, the installed thermal capacity is 24.62 MW. The control system of the all-year-round power plant allows island operation, operation in parallel to the grid or other power plants. The special dispatching system was designed to increase the reliability of the gas piston gensets and significantly reduce the response time to a possible emergency situation. Due to the low consumption during the nighttime the smaller gensets can takeover the load while during the day all gensets are in operation and provide electrical and thermal power supply.